Capital Projects Over our history, we have come a long way from the first tents out on the camp field. Now, our 98 acres consist of 23 buildings and various outdoor spaces for prayer and play.
These facilities are truly a blessing from God that must be maintained for future generations. Much renovation and restoration are needed, providing us with a challenging but glorious opportunity.
|
|
Keep Reading For Our Full Project List!
Component 1: Improving Buildings*
Director's Cabin:
Replace Back Door Frame - Completed! Repair Ceiling - Completed! Renovate Bathroom - Completed! Update Kitchen - Completed! Replace Porch Roof Supports - Completed! Chimney Repair - Completed! Replace Flooring - Completed! Update Electrical - Completed! Maintenance Building: Repair Garage Door Build Addition Repair Gutter/Downspouts - Completed! Update Electrical - Completed! Health Center: Update Electrical - Completed! Director's House: Chimney Repair Replace Back Porch Roof - Completed! Gutter Covers - Completed! Paint Deck - Completed! Siding House - Completed! Hoover Building: Replace Door & Frame |
Component 2: Outdoor Areas*
Paving: - Completed!
From the entrance gate to the field gate, including the lodge loading area Stairways: Replacing the steps to the cabin areas Basketball Court: - Completed! Resurfacing the court Drainage: Around the basketball court & away from the Director’s House |
Beach:
Purchase additional dock & water safety equipment House: Grade slope next to the driveway Trees: - In Process! Remove dangerous trees around camp, grind out stumps Amenities: - In Process! Clotheslines, patio swings, Adirondack chairs, picnic tables |
Component 3: Upgrading Appliances / Electronics*
Upgrade to Commercial Freezers
- Completed! Replace Director’s Cabin refrigerator - Completed! Upgrade whole-camp P.A. system Replace Gravely mower - Completed! |
Replace current dehumidifier units and purchase one additional
- In Process! Purchase a room A/C unit for guest groups Replace Six Water Heaters Replace 2014 Dodge Ram |
Component 4: Environmental Projects*
Solar Panels
Add panels to the lodge roof, along with battery system Generator System Purchase an automatic generator for the lodge; install a propane tank & line - Completed! |
LED Lighting
Replace lighting in all building with LEDs - In Process! Path Timers & Lights Upgrade timing systems & light fixtures |
Component 5: Expansion*
Purchase Neighboring All-Weather Lodge & Property (for sale by FFA Muskingum) - In Process!
Repairs to Windows & Foundation - In Process! Utilities - Electrical, Propane, Lease - In Process! |
Total Project Cost: $999,000**
*Projects will be addressed based on urgency of need as determined by the Director and the Pass It On Taskforce. Completion of projects will be overseen by Director, Camp Wakonda's Board, and the Business Administrator of Christ Presbyterian Church. All projects have been approved by the Session of Christ Presbyterian Church.